L-TEC Rotary Railcar Dumping System The Gotthard Base-Tunnel, Switzerland - section Bodio 2 dumping systems of type L-TEC 5-25 for simultaneous unloading of 5 railcars of type Mühlhäuser ROTA-CAR 25 m³ each
| plant length |
50.5 m |
dumping speed |
1 U / min |
| width |
5,000 mm / line |
total time for 1 unloading inclusively positioning of the railcars |
5 min for 2 x 5 railcars |
| rotation diameter |
4,000 mm |
dumping performance |
2 x 250 tons of material/dumping |
| plant weight |
approx. 250 tons |
total engine output |
2 x 130 kW | |
|
| |
 |
|
 |
| |
|
|